Overview

On modern office developments, the value is often hidden in the building services: controls, alarms, data, power, ventilation, lifts, standby systems and external infrastructure. The challenge is that these items can be spread across multiple packages and cost lines, making it easy to under-claim or misclassify expenditure.

The client wanted clarity and confidence in relation to construction works being carried out: a claim value of £4m+ meant  thorough, correctly categorised, and easy to understand was needed, without unnecessary disruption.

The Property: What was delivered and why it matters

The property comprises a two-storey office building with brick cavity walls and a pitched tiled roof.

Our approach:
methodical, evidence-led, and built to stand up to scrutiny

For projects like this, the key is making sure the claim reflects the real-world build and that the categorisation is clear.

We assessed the capital expenditure, identified and extracted qualifying plant and machinery items from the wider construction spend, categorised expenditure appropriately between main pool, special rate pool, and moveable plant and machinery, considered expenditure falling under Structures and Buildings Allowance (SBA) and produced a structured, defensible breakdown to support the client and their advisers

The aim was simple: make the claim complete, correctly categorised, and easy to follow.